Challenge, solution, and result
The challenge
Modernize the Popayán main substation, the main point of the Cauca transmission system, to strengthen the reliability and security of the regional power system.
The solution
Transition from conventional infrastructure to a digital IEC 61850 architecture: engineering, panels, FAT, SAT, and AG Builder3 SCADA.
The result
Seven 115 kV bays and 13.2 kV cells in service, monitored and controlled in real time from a single interface.
From a conventional substation to a fully digital one
In line with its commitment to strengthen the reliability and security of the regional power system, Compañía Energética de Occidente (CEO, a Colombian utility) undertook the comprehensive modernization of the Popayán main substation, the main point of the transmission system in the department of Cauca.
The challenge was to take the substation from conventional infrastructure to a fully digital architecture under the IEC 61850 standard, in a main bus plus transfer bus topology with voltage levels of 115, 34.5, and 13.2 kV.
- ClientCompañía Energética de Occidente
- LocationPopayán, Cauca
- TopologyMain bus plus transfer bus

How Axon Group digitalized the main substation
Engineering
From site survey to detailed design
Technical site survey and basic and detailed engineering of the new digital IEC 61850 architecture.
Panels
Construction, FAT, and SAT
Construction and integration of station auxiliary systems, protection, metering, communications, and digital marshalling panels, with complete factory assembly (FAT) and field commissioning (SAT).
SCADA
Monitoring with AG Builder3
AG Builder3 SCADA centralizes signals from multiple IEDs and simplifies testing, maintenance, and operation from an intuitive HMI.
The impact on operations
What we used with CEO
Other projects with Axon Group
- GenerationCO
Urrá hydropower plant
SCADA modernization at a 340 MW power plant
New AG Builder3 SCADA and AG Exchange gateways with Hot-Standby redundancy.
- GenerationCO
CHEC · EPM Group
Fault diagnosis with AG Comtrade
Automatic collection of protection relay records to analyze every fault on the network.
- InfrastructurePA
Celmec · Tocumen Airport
Terminal 2 power system automation
Remote control from the control room, load shedding and reconnection, and a redundant control network.
2018–2019Read the full case