Success story · Generation

Urrá: control system modernization at a 340 MW power plant

How Axon Group replaced the SCADA and communications gateways at the Urrá hydropower plant without interrupting operations.

  • ClientUrrá
  • CountryColombia
  • SectorGeneration
  • ProductsAG Builder3 · AG Exchange
The story in 30 seconds

Challenge, solution, and result

The challenge

Replace the plant's SCADA and communications gateways without interrupting operations while keeping integration with all of its systems.

The solution

AG Builder3 SCADA and AG Exchange gateway, with Hot-Standby redundancy, historical data migration, and secure remote control.

The result

A more reliable, secure, and efficient system, with availability above 99.92%.

The challenge

Modernizing control without stopping generation

In the heart of the department of Córdoba, the Urrá hydropower plant, with 340 MW of installed capacity and 25 years since it entered operation, is key to power generation in Colombia.

The plant needed a more reliable, flexible system capable of integrating different technologies and protocols. The challenge: replace its SCADA and communications gateways without interrupting operations while keeping integration with all of its existing systems.

  • ClientUrrá hydropower plant
  • LocationCórdoba, Colombia
  • Capacity340 MW
Aerial view of the powerhouse of the Urrá hydropower plant
Urrá hydropower plant
The solution

How Axon Group modernized control at Urrá

  1. Integration

    Multiple industrial protocols

    The AG Exchange gateway integrates the generation units, substations, hydraulic systems, and auxiliary systems, using multiple industrial protocols.

  2. Monitoring

    AG Builder3 SCADA

    Real-time monitoring, advanced trend panels, interlocking diagrams, and secure remote control.

  3. Continuity

    Redundancy and historical data

    Hot-Standby redundancy and migration of the historical data from the previous system, without interrupting plant operations.

In the field

The story on video

See how the Urrá power plant renewed its control and monitoring system with AG Builder3 and AG Exchange.

Results

The impact on operations

+99.92%Control system availability
Hot-StandbySCADA and gateway redundancy
No downtimeMigration without interrupting operations
More stories

Other projects with Axon Group

  • GenerationCO

    CHEC · EPM Group

    Fault diagnosis with AG Comtrade

    Automatic collection of protection relay records to analyze every fault on the network.

    • AG Comtrade
    • COMTRADE
    • Protection
  • InfrastructurePA

    Celmec · Tocumen Airport

    Terminal 2 power system automation

    Remote control from the control room, load shedding and reconnection, and a redundant control network.

    • AG Builder3
    • AG Exchange
    • Redundant networks
  • SubstationsPE

    ISA REP Peru

    Control, protection, and metering for 8 substations at 230 and 138 kV

    Multi-brand integration with redundant gateways and dual IEC 61850 reporting.

    • IEC 61850
    • GOOSE
    • Multi-brand

Does your power plant need a new control system?

Tell us about your project and an AG specialist will guide you.