Tocumen Airport: Terminal 2 power system automation

How Axon Group integrated the SCADA and control network at Tocumen International Airport to operate power remotely and restore it after supply failures.

  • ClientCelmec · AITSA
  • CountryPanama
  • Timeline2018–2019
  • ProductsAG Builder3 · AG Exchange
The story in 30 seconds

Challenge, solution, and result

The challenge

Interrupting the electrical connection required sending staff to four different points and disconnecting the entire Terminal 1 load.

The solution

AG Builder3 SCADA to operate from the control room, controls for the backup generators, and a segmented, redundant control network.

The result

Remote operation, power restoration after supply failures, and communication between equipment of different technologies.

The challenge

An international airport cannot afford to lose power

Operating staff had to travel to four different points to interrupt the electrical connection, which meant disconnecting the entire Terminal 1 load.

In addition, Terminal 2 was reconnected using backup generators after supply failures, and the ring of the Tocumen substation control network became saturated with topology changes. The main challenge: connecting equipment of different technologies and achieving interoperability across the airport.

  • ClientCelmec · Tocumen Airport
  • ScopeTerminal 2 power system
  • ChallengeInteroperability between technologies
Airport power system
The solution

How Axon Group integrated airport operations

  1. Operation

    Remote control from the control room

    A graphical interface was created in AG Builder3 that consolidates all the power system signals and allows operation from the client console.

  2. Backup

    Load shedding and load reconnection

    Controls to connect the generators and restore power when the supply fails; the operator configures load shedding and reconnection.

  3. Network

    A redundant control network

    Routers, a gateway, and switches were designed and configured with segmentation and redundancy protocols; AG Exchange interconnects the operating levels.

Results

The impact on operations

4 pointsOf interruption, now operated remotely
AutomaticPower restoration with backup generators
RedundantControl network segmented to withstand topology changes

This project left me quite impressed, and I saw firsthand the high level of integrators you have, because it was a very complex project. It shows that you have great human talent and that your software works for many applications.

Jossue Moisés CalvoTocumen Airport · Terminal 2
More stories

Other projects with Axon Group

  • SubstationsPE

    ISA REP Peru

    Control, protection, and metering for 8 substations at 230 and 138 kV

    Multi-brand integration with redundant gateways and dual IEC 61850 reporting.

    • IEC 61850
    • GOOSE
    • Multi-brand
  • GenerationCO

    EPM

    Remote management and monitoring of 17 power plants

    260 relays integrated and a SCADA that the EPM team now configures on its own.

    • AG Builder3
    • AG Exchange
    • 15,000 tags
  • GenerationCO

    J.E. Jaimes · Trina Solar

    Connection of the Bosques Solares de los Llanos project

    More than 50 MW of photovoltaic capacity connected to the national power system in 7 months.

    • SIPROTEC 5
    • IEC 61850
    • IEC 60870-5-104