Success story · Infrastructure
Tocumen Airport: Terminal 2 power system automation
How Axon Group integrated the SCADA and control network at Tocumen International Airport to operate power remotely and restore it after supply failures.
- ClientCelmec · AITSA
- CountryPanama
- Timeline2018–2019
- ProductsAG Builder3 · AG Exchange
Challenge, solution, and result
The challenge
Interrupting the electrical connection required sending staff to four different points and disconnecting the entire Terminal 1 load.
The solution
AG Builder3 SCADA to operate from the control room, controls for the backup generators, and a segmented, redundant control network.
The result
Remote operation, power restoration after supply failures, and communication between equipment of different technologies.
An international airport cannot afford to lose power
Operating staff had to travel to four different points to interrupt the electrical connection, which meant disconnecting the entire Terminal 1 load.
In addition, Terminal 2 was reconnected using backup generators after supply failures, and the ring of the Tocumen substation control network became saturated with topology changes. The main challenge: connecting equipment of different technologies and achieving interoperability across the airport.
- ClientCelmec · Tocumen Airport
- ScopeTerminal 2 power system
- ChallengeInteroperability between technologies

How Axon Group integrated airport operations
Operation
Remote control from the control room
A graphical interface was created in AG Builder3 that consolidates all the power system signals and allows operation from the client console.
Backup
Load shedding and load reconnection
Controls to connect the generators and restore power when the supply fails; the operator configures load shedding and reconnection.
Network
A redundant control network
Routers, a gateway, and switches were designed and configured with segmentation and redundancy protocols; AG Exchange interconnects the operating levels.
The impact on operations
This project left me quite impressed, and I saw firsthand the high level of integrators you have, because it was a very complex project. It shows that you have great human talent and that your software works for many applications.
What we used at Tocumen
Other projects with Axon Group
- SubstationsPE
ISA REP Peru
Control, protection, and metering for 8 substations at 230 and 138 kV
Multi-brand integration with redundant gateways and dual IEC 61850 reporting.
- GenerationCO
EPM
Remote management and monitoring of 17 power plants
260 relays integrated and a SCADA that the EPM team now configures on its own.
- GenerationCO
J.E. Jaimes · Trina Solar
Connection of the Bosques Solares de los Llanos project
More than 50 MW of photovoltaic capacity connected to the national power system in 7 months.
2019–2020Read the full case