Success story · Generation
Bosques Solares de los Llanos: engineering for the connection to the national power system
How Axon Group delivered the basic and detailed engineering to connect Trina Solar's photovoltaic project to the national power system in 7 months.
- ClientJ.E. Jaimes · Trina Solar
- CountryColombia
- Timeline2019–2020
- ProductsAG Exchange · AG Builder3
Challenge, solution, and result
The challenge
Connect the Bosques Solares de los Llanos 1, 2, and 3 photovoltaic project to the national power system within the 7 months set, in the middle of the health emergency.
The solution
Basic and detailed engineering, 10 panels, and Siemens SIPROTEC 5 relays integrated with AG Exchange and AG Builder3, using IEC 61850 and IEC 60870-5-104.
The result
More than 50 MW connected, main and backup protection in every bay, and the project energized on schedule.
Connecting solar power to the national grid, on time
Connecting solar parks to the national power system is one of the biggest challenges for companies like Trina Solar, which contribute to the expansion of renewable energy in the country.
Hired by J.E. Jaimes, Axon Group faced the major challenge of delivering the project within the 7 months established. Because of the country's health emergency, biosafety protocols were strictly applied.
- ClientJ.E. Jaimes · Trina Solar
- ProjectBosques Solares de los Llanos 1, 2, and 3
- Timeframe7 months

How Axon Group connected the solar park
Panels
10 panels for the project phases
Seven control and protection panels for the line, coupling, and transformer bays, two metering panels for 115 kV and 34.5 kV, and one SAS communications panel.
Protocols
IEC 61850 and IEC 60870-5-104
IEC 61850 server in the IEDs, IEC 61850 client in the AG Exchange data concentrator, and IEC 60870-5-104 in the gateway toward the local SCADA and the control center.
Reliability
Main and backup protection
Main and backup protection relays in every bay, with the robustness and redundancy that state-of-the-art 115 kV substations demand.
The impact on operations
What we used at Bosques Solares
Other projects with Axon Group
- SubstationsCO
EBSA
Modernization and automation of the Donato substation
115 kV substation with redundant AG Exchange data concentrators and AG Builder3 HMI.
2019–2020Read the full case - SubstationsCO
CEO · Compañía Energética de Occidente
Digitalization of the Popayán main substation
From conventional infrastructure to a 115 kV digital IEC 61850 substation.
- GenerationCO
Urrá hydropower plant
SCADA modernization at a 340 MW power plant
New AG Builder3 SCADA and AG Exchange gateways with Hot-Standby redundancy.