Success story · Generation

Bosques Solares de los Llanos: engineering for the connection to the national power system

How Axon Group delivered the basic and detailed engineering to connect Trina Solar's photovoltaic project to the national power system in 7 months.

  • ClientJ.E. Jaimes · Trina Solar
  • CountryColombia
  • Timeline2019–2020
  • ProductsAG Exchange · AG Builder3
The story in 30 seconds

Challenge, solution, and result

The challenge

Connect the Bosques Solares de los Llanos 1, 2, and 3 photovoltaic project to the national power system within the 7 months set, in the middle of the health emergency.

The solution

Basic and detailed engineering, 10 panels, and Siemens SIPROTEC 5 relays integrated with AG Exchange and AG Builder3, using IEC 61850 and IEC 60870-5-104.

The result

More than 50 MW connected, main and backup protection in every bay, and the project energized on schedule.

The challenge

Connecting solar power to the national grid, on time

Connecting solar parks to the national power system is one of the biggest challenges for companies like Trina Solar, which contribute to the expansion of renewable energy in the country.

Hired by J.E. Jaimes, Axon Group faced the major challenge of delivering the project within the 7 months established. Because of the country's health emergency, biosafety protocols were strictly applied.

  • ClientJ.E. Jaimes · Trina Solar
  • ProjectBosques Solares de los Llanos 1, 2, and 3
  • Timeframe7 months
Park substation connection
The solution

How Axon Group connected the solar park

  1. Panels

    10 panels for the project phases

    Seven control and protection panels for the line, coupling, and transformer bays, two metering panels for 115 kV and 34.5 kV, and one SAS communications panel.

  2. Protocols

    IEC 61850 and IEC 60870-5-104

    IEC 61850 server in the IEDs, IEC 61850 client in the AG Exchange data concentrator, and IEC 60870-5-104 in the gateway toward the local SCADA and the control center.

  3. Reliability

    Main and backup protection

    Main and backup protection relays in every bay, with the robustness and redundancy that state-of-the-art 115 kV substations demand.

Results

The impact on operations

+50 MWOf photovoltaic capacity connected to the national power system
10 panelsFor control, protection, metering, and communications
7 monthsDeadline met under biosafety protocols
More stories

Other projects with Axon Group

  • SubstationsCO

    EBSA

    Modernization and automation of the Donato substation

    115 kV substation with redundant AG Exchange data concentrators and AG Builder3 HMI.

    • AG Exchange
    • AG Builder3
    • FAT · SAT
  • SubstationsCO

    CEO · Compañía Energética de Occidente

    Digitalization of the Popayán main substation

    From conventional infrastructure to a 115 kV digital IEC 61850 substation.

    • IEC 61850
    • AG Builder3
    • FAT · SAT
  • GenerationCO

    Urrá hydropower plant

    SCADA modernization at a 340 MW power plant

    New AG Builder3 SCADA and AG Exchange gateways with Hot-Standby redundancy.

    • AG Builder3
    • AG Exchange
    • Hot-Standby

Are you going to connect a renewable project to the grid?

Tell us about your project and an AG specialist will guide you.