Donato substation: modernization and automation for EBSA

How Axon Group modernized the Donato 115 kV substation of Empresa de Energía de Boyacá (EBSA) to operate with greater reliability and less maintenance.

  • ClientEBSA
  • CountryColombia
  • Timeline2019–2020
  • ProductsAG Exchange · AG Builder3
The story in 30 seconds

Challenge, solution, and result

The challenge

Modernize the Donato 115 kV substation to operate with greater reliability and less maintenance, meeting the schedule in the middle of the health emergency.

The solution

Engineering and supply of the control and protection system: two panels with redundant AG Exchange data concentrators, AG Builder3 HMI, and ABB, Siemens, and GE equipment.

The result

20 bays at 13.8 and 34.5 kV automated, FAT, SAT, and control center tests completed, and delivery on time.

The challenge

A more reliable substation with less maintenance

New technologies allow substations to operate with greater reliability, reduce maintenance time, and avoid failures that drive up repair costs. That is why Empresa de Energía de Boyacá began the modernization of the Donato substation.

Donato is a 115 kV single-bus substation with three 115 kV lines, two 115/13.8 kV transformers, and one 115/34.5 kV transformer. The biggest challenge: meeting delivery deadlines in the middle of the health emergency.

  • ClientEBSA · Energía de Boyacá
  • Configuration115 kV single bus
  • EquipmentABB, Siemens, and GE
115 kV substation
The solution

How Axon Group automated the Donato substation

  1. Control

    Redundant data concentrators

    Two panels, each with an AG Exchange data concentrator for a redundant system, and a Level 2 AG Builder3 HMI for monitoring and control.

  2. Integration

    Three voltage levels

    At 115 kV, ABB and Siemens equipment was integrated and configured; at 34.5 kV (7 bays) and 13.8 kV (13 bays), GE equipment.

  3. Testing

    FAT, SAT, and control center

    Design and engineering of the panels, configuration of relays, bay controllers, data concentrators, and HMI, plus FAT, SAT, and control center tests.

Results

The impact on operations

20 baysAt 13.8 kV and 34.5 kV, automated
RedundantControl with two AG Exchange data concentrators
On timeDelivered in the middle of the health emergency
More stories

Other projects with Axon Group

  • SubstationsCO

    CEO · Compañía Energética de Occidente

    Digitalization of the Popayán main substation

    From conventional infrastructure to a 115 kV digital IEC 61850 substation.

    • IEC 61850
    • AG Builder3
    • FAT · SAT
  • GenerationCO

    Urrá hydropower plant

    SCADA modernization at a 340 MW power plant

    New AG Builder3 SCADA and AG Exchange gateways with Hot-Standby redundancy.

    • AG Builder3
    • AG Exchange
    • Hot-Standby
  • GenerationCO

    CHEC · EPM Group

    Fault diagnosis with AG Comtrade

    Automatic collection of protection relay records to analyze every fault on the network.

    • AG Comtrade
    • COMTRADE
    • Protection

Does your substation need modernizing?

Tell us about your project and an AG specialist will guide you.