Resources
Keep learning and stay connected
Technical content, events, and tools for the power sector engineering community.
- Digital substationsTime synchronization in a digital substation is essential for Sampled Values
- IEC 61850IEC 61850: everything you need to know about GOOSE
- IEC 61850Sending a GOOSE message from an SEL 451 to an ABB REF620
- CybersecuritySubstation cybersecurity tips
- Digital substationsAutomatic fault record collection: challenges and opportunities
- IEC 61850Webinar: IEC 61850, the evolution of substation automation
- IEC 61850IEC 61850 configuration: MMS and Sampled Values
- CybersecurityRisk assessment: the first step toward digitalization
- TelecontrolIEC 60870-5-101/104 tips
- Digital substationsDigital substations: challenges and opportunities
- IEC 61850Decoding IEC 61850: reports and report control blocks
- Digital substationsWebinar: introduction to digital substations
Latest from the blog
Technical articles from our specialists
Digital substationsLatest articleTime synchronization in a digital substation is essential for Sampled Values
Read article- IEC 61850IEC 61850 configuration: MMS and Sampled Values
- IEC 61850IEC 61850: everything you need to know about GOOSE
- CybersecurityRisk assessment: the first step toward digitalization
- IEC 61850Sending a GOOSE message from an SEL 451 to an ABB REF620
- TelecontrolIEC 60870-5-101/104 tips
- CybersecuritySubstation cybersecurity tips
- Digital substationsDigital substations: challenges and opportunities
- Digital substationsAutomatic fault record collection: challenges and opportunities
- IEC 61850Decoding IEC 61850: reports and report control blocks
- IEC 61850Webinar: IEC 61850, the evolution of substation automation
- Digital substationsWebinar: introduction to digital substations
- Digital substationsEthernet redundancy protocols for substation automation networks
- TelecontrolBasic example of PMU to PDC communication
- TelecontrolSynchrophasor networks
- CybersecurityHow to protect industrial systems and critical infrastructure from malware like WannaCry
- CybersecurityNERC CIP 002 to 009 summary
- CybersecurityCybersecurity and NERC CIP 002 to 009
- IEC 61850IEC 61850 edition 1 vs. edition 2
- CybersecurityCritical infrastructure in the power sector and Colombian cybersecurity law
Events
Face to face with the AG community
Two places to meet in person: an annual industry event and a demonstration tour across the region.
Annual event