Success story · Generation
EPM: remote management and monitoring of 17 power plants
The scale of the project pointed to at least a year of work. Axon Group delivered it in a record time of 3 months.
- ClientEPM
- CountryColombia
- Timeline2012
- ProductsAG Builder3 · AG Exchange
Challenge, solution, and result
The challenge
Remotely monitor EPM's 17 power plants by integrating 260 relays, a project forecast to take at least a year.
The solution
License and configuration of AG Builder3 SCADA for 15,000 tags and 5 remote clients, with a serial server, an AG Exchange gateway, and engineering.
The result
About 75% less time, lower long-term costs, and an EPM team that now configures the software on its own.
Seventeen power plants, one monitoring system
The project covered the integration of 260 relays distributed across EPM's 17 power plants, with the supply of the license and the configuration of AG Builder3 SCADA with 5 clients.
Given its scale, a minimum of 1 year of work was forecast. AG Builder3 makes it easy to build applications, which made it possible to deliver the project in a record time of 3 months.
- ClientEPM · Colombia
- Scope260 relays at 17 power plants
- License15,000 tags · 5 remote clients

How Axon Group connected the 17 power plants
Integration
260 relays in a single system
The relays of the 17 power plants were integrated using a serial server and the AG Exchange communications gateway.
SCADA
AG Builder3 for 15,000 tags
The AG Builder3 license for 15,000 tags and 5 remote clients was supplied and configured, together with the project engineering.
Autonomy
Software that EPM masters
Learning it proved easy and intuitive: today EPM no longer hires engineering services to configure or modify the software and only buys the licenses.
The impact on operations
17 power plants
- Porce II
- Porce III
- Guatapé
- La Sierra
- La Tasajera
- Guadalupe III and El Salto substation
- Guadalupe IV
- Playas
- Troneras
- La Herradura
- Jepirachi
- Sonsón I
- Sonsón II
- La Vuelta
- Pajarito
- Ayurá
- Grande
What we used with EPM
Other projects with Axon Group
- GenerationCO
J.E. Jaimes · Trina Solar
Connection of the Bosques Solares de los Llanos project
More than 50 MW of photovoltaic capacity connected to the national power system in 7 months.
2019–2020Read the full case - SubstationsCO
EBSA
Modernization and automation of the Donato substation
115 kV substation with redundant AG Exchange data concentrators and AG Builder3 HMI.
2019–2020Read the full case - SubstationsCO
CEO · Compañía Energética de Occidente
Digitalization of the Popayán main substation
From conventional infrastructure to a 115 kV digital IEC 61850 substation.