ISA REP Peru: control, protection, and metering for 8 substations at 230 and 138 kV

How Axon Group integrated equipment from six manufacturers in ISA REP substations, with redundant gateways and dual IEC 61850 reporting.

  • ClientISA REP
  • CountryPeru
  • Timeline2012
  • ScopeControl, protection, and metering
The story in 30 seconds

Challenge, solution, and result

The challenge

Existing and new substations with equipment from several manufacturers, and redundant Siemens and Cooper gateways that required dual IEC 61850 reporting.

The solution

Supply of equipment, panels, and wiring, plus configuration and testing of the control, protection, and metering of each substation.

The result

SICAM PAS, WinCC, MicroScada, and SMP gateways configured, relays from four brands integrated, and GOOSE messages exchanged between them.

The challenge

Many substations, many manufacturers

Because of the number of existing and new substations, the project demanded knowledge and skill in handling equipment from several manufacturers: Siemens, ABB, General Electric, Alstom, Schneider Electric, and SEL, among others. Axon Group's experience with all of them is why the project was awarded to our team.

In addition, the systems had a redundant configuration in the Siemens and Cooper gateways, which increased the complexity: dual reporting had to be generated for the IEC 61850 standard.

  • ClientISA REP · Peru
  • SubstationsPuno, Ayaviri, Piura, Pariñas, Trujillo Norte, and Reque
  • AssociatedTalara, Chiclayo, and Recka
230 and 138 kV substations
The solution

How Axon Group integrated equipment from six manufacturers

  1. Gateways

    SICAM PAS and Cooper SMP

    Siemens SICAM PAS gateways were configured to integrate SEL and Siemens relays, and Cooper SMP gateways for SEL, ABB, Siemens, and Alstom relays.

  2. Monitoring

    WinCC and MicroScada

    WinCC was configured for the bays of these relays, and ABB MicroScada software was used to integrate SEL relays.

  3. Protection

    Control, protection, and GOOSE

    The control and protection functions of the Siemens, SEL, ABB, and Alstom relays were configured, along with GOOSE messages between SEL–ABB and ABB–Siemens relays.

Results

The impact on operations

8 substationsAt 230 and 138 kV with control, protection, and metering
6 manufacturersIntegrated into a single system
GOOSEMessages between SEL, ABB, and Siemens relays
More stories

Other projects with Axon Group

  • GenerationCO

    EPM

    Remote management and monitoring of 17 power plants

    260 relays integrated and a SCADA that the EPM team now configures on its own.

    • AG Builder3
    • AG Exchange
    • 15,000 tags
  • GenerationCO

    J.E. Jaimes · Trina Solar

    Connection of the Bosques Solares de los Llanos project

    More than 50 MW of photovoltaic capacity connected to the national power system in 7 months.

    • SIPROTEC 5
    • IEC 61850
    • IEC 60870-5-104
  • SubstationsCO

    EBSA

    Modernization and automation of the Donato substation

    115 kV substation with redundant AG Exchange data concentrators and AG Builder3 HMI.

    • AG Exchange