Success story · Substations
ISA REP Peru: control, protection, and metering for 8 substations at 230 and 138 kV
How Axon Group integrated equipment from six manufacturers in ISA REP substations, with redundant gateways and dual IEC 61850 reporting.
- ClientISA REP
- CountryPeru
- Timeline2012
- ScopeControl, protection, and metering
Challenge, solution, and result
The challenge
Existing and new substations with equipment from several manufacturers, and redundant Siemens and Cooper gateways that required dual IEC 61850 reporting.
The solution
Supply of equipment, panels, and wiring, plus configuration and testing of the control, protection, and metering of each substation.
The result
SICAM PAS, WinCC, MicroScada, and SMP gateways configured, relays from four brands integrated, and GOOSE messages exchanged between them.
Many substations, many manufacturers
Because of the number of existing and new substations, the project demanded knowledge and skill in handling equipment from several manufacturers: Siemens, ABB, General Electric, Alstom, Schneider Electric, and SEL, among others. Axon Group's experience with all of them is why the project was awarded to our team.
In addition, the systems had a redundant configuration in the Siemens and Cooper gateways, which increased the complexity: dual reporting had to be generated for the IEC 61850 standard.
- ClientISA REP · Peru
- SubstationsPuno, Ayaviri, Piura, Pariñas, Trujillo Norte, and Reque
- AssociatedTalara, Chiclayo, and Recka

How Axon Group integrated equipment from six manufacturers
Gateways
SICAM PAS and Cooper SMP
Siemens SICAM PAS gateways were configured to integrate SEL and Siemens relays, and Cooper SMP gateways for SEL, ABB, Siemens, and Alstom relays.
Monitoring
WinCC and MicroScada
WinCC was configured for the bays of these relays, and ABB MicroScada software was used to integrate SEL relays.
Protection
Control, protection, and GOOSE
The control and protection functions of the Siemens, SEL, ABB, and Alstom relays were configured, along with GOOSE messages between SEL–ABB and ABB–Siemens relays.
The impact on operations
What we did with ISA REP
Other projects with Axon Group
- GenerationCO
EPM
Remote management and monitoring of 17 power plants
260 relays integrated and a SCADA that the EPM team now configures on its own.
- GenerationCO
J.E. Jaimes · Trina Solar
Connection of the Bosques Solares de los Llanos project
More than 50 MW of photovoltaic capacity connected to the national power system in 7 months.
2019–2020Read the full case - SubstationsCO
EBSA
Modernization and automation of the Donato substation
115 kV substation with redundant AG Exchange data concentrators and AG Builder3 HMI.
2019–2020Read the full case