COMTRADE
Common Format for Transient Data Exchange (IEEE C37.111 / IEC 60255-24)COMTRADE is the standard format for storing and exchanging the fault records (oscillography) captured by protection relays and recorders.
Each record is made up of several files: .cfg (channel configuration), .dat (samples), and optionally .hdr and .inf. Because it is a common format, it lets you analyze records from devices of different vendors in a single tool.
Learn more: AG Comtrade · Automatic fault record collection
Digital substation
A digital substation digitizes the signals of switchyard equipment in the field and carries them over optical fiber using IEC 61850, instead of copper wiring.
It uses merging units, Sampled Values, GOOSE, and PTP synchronization. It reduces wiring and installation time and improves monitoring, but requires new skills in design, testing, and cybersecurity.
Learn more: Digital substations · Digital substations course · Digital substations: challenges and opportunities
DNP3
Distributed Network Protocol 3 (IEEE 1815)DNP3 is a telecontrol protocol between a master station (SCADA) and remote outstations, widely used by electric and water utilities.
It runs over serial links or TCP/IP, reports by exception, keeps events with timestamps, and groups data into classes. Secure Authentication protects the commands.
Learn more: DNP3 course · AG 800 · AG Test6
FAT and SAT
Factory Acceptance Test and Site Acceptance TestFAT and SAT are the acceptance tests of a system: the FAT is performed at the factory before shipment and the SAT on site, after installation.
In substation automation they verify signals, controls, interlocking, and communications against the project specification. Simulating devices that do not exist yet makes it possible to bring the FAT forward and document each test in a test report.
Learn more: AG Test6 · Engineering
GOOSE
Generic Object Oriented Substation Event (IEC 61850-8-1)GOOSE is the IEC 61850 message that IEDs use to exchange trips, blocking, and interlocking signals within a few milliseconds.
It travels in Layer 2 multicast Ethernet frames, without TCP/IP, using a publisher-subscriber model and periodic retransmissions that confirm the state. It replaces much of the control wiring between relays.
Learn more: IEC 61850: everything you need to know about GOOSE · Sending a GOOSE message from an SEL 451 to an ABB REF620 · AG Test6
ICCP / TASE.2
Inter-Control Center Communications Protocol (IEC 60870-6 TASE.2)ICCP, or TASE.2, is the protocol that control centers of operators, transmission companies, and generators use to exchange data in real time.
It builds on MMS and defines bilateral tables that set which data each party shares. Monitoring the availability of ICCP links is key to meeting the indicators that system operators require.
Learn more: AG ICCP Detector · AG Test6
IEC 60870-5-101 / 104
IEC 60870-5-101 and 104 are the IEC telecontrol standards: 101 works over a serial link and 104 over TCP/IP networks.
They define how a control station polls substations, receives events, and sends commands to them. 104 is today the most widely used standard between substations and control centers in Latin America and Europe.
Learn more: IEC 60870-5-104 course · IEC 60870-5-101/104 tips · AG 800
IEC 61131-3
IEC 61131-3 is the standard that defines the programming languages for controllers (PLCs): ladder diagram, function blocks, structured text, and others.
It allows control and interlocking logic to be written once and ported across platforms. In substation testing, an IEC 61131-3 virtual PLC reproduces the logic of a device that is not yet available.
Learn more: AG Test6
IEC 61850
IEC 61850 is the international communication standard for electrical substation automation: it defines the data model, the configuration, and the communication services.
It organizes each function into logical nodes, describes the substation in SCL files, and communicates with MMS (client-server), GOOSE (fast events), and Sampled Values (digitized measurements). It is the foundation of the digital substation.
Learn more: IEC 61850 course · IEC 61850 edition 1 vs. edition 2 · AG Test6
IEC 62443
IEC 62443 is the series of cybersecurity standards for industrial automation and control systems (IACS).
It organizes the network into zones and conduits, defines security levels, and sets requirements for asset owners, integrators, and manufacturers. It complements power sector regulations such as NERC CIP.
Learn more: OT cybersecurity · OT networks course
IED
Intelligent Electronic DeviceAn IED is a microprocessor-based electronic device, such as a protection relay, a meter, or a bay controller, that communicates with other systems.
IEDs measure, protect, and control substation equipment and publish their information over protocols such as IEC 61850, DNP3, or Modbus to the gateway and the SCADA.
Learn more: AG 800 · AG Comtrade
MMS
Manufacturing Message Specification (ISO 9506)MMS is the client-server protocol over TCP/IP that IEC 61850 uses to read and write data, receive reports, execute controls, and transfer files.
It is the channel between the IEDs and the SCADA or the gateway. Reports (BRCB and URCB) send changes without the client having to ask. ICCP / TASE.2 is also based on MMS.
Learn more: IEC 61850 configuration: MMS and Sampled Values · Decoding IEC 61850: reports and report control blocks
Modbus
Modbus is a master-slave industrial communication protocol, widely adopted for its simplicity, that reads and writes a device registers and coils.
It exists in a serial version (RTU) and over TCP/IP. In substations it is mostly used with meters, chargers, and auxiliary devices that do not have power system protocols.
NERC CIP
Critical Infrastructure ProtectionNERC CIP is the set of standards from the North American Electric Reliability Corporation to protect the cyber assets that operate the power system.
It covers critical asset identification, security perimeters, access management, incident response, and recovery. It is a reference for sector cybersecurity regulation in other countries.
Learn more: NERC CIP 002 to 009 summary · OT cybersecurity
Oscillography
Oscillography is the record of the current and voltage waveforms that a relay or recorder captures during a fault.
Together with the relay events and settings, it shows what happened, where, and why the protection operated. It is stored in COMTRADE format, and collecting it automatically speeds up fault analysis.
Learn more: AG Comtrade
OT (operational technology)
Operational technology (OT) is the hardware and software that monitors and controls physical processes, such as substations, power plants, or distribution networks.
Unlike IT networks, in OT the priority is availability and real-time operation. That is why its cybersecurity needs its own segmentation, monitoring, and access management practices.
Learn more: OT networks course · OT cybersecurity
PMU and synchrophasors
Phasor Measurement Unit (IEEE C37.118)A PMU measures voltage and current phasors with a timestamp synchronized by GPS; those synchronized measurements are called synchrophasors.
A PDC (Phasor Data Concentrator) receives data from several PMUs and forms a synchrophasor network to monitor power system dynamics in real time.
Learn more: Synchrophasor networks · Basic example of PMU to PDC communication
PRP and HSR
Parallel Redundancy Protocol and High-availability Seamless Redundancy (IEC 62439-3)PRP and HSR are Ethernet redundancy protocols with zero recovery time: each frame travels over two paths and the receiver discards the duplicate.
PRP uses two independent LANs; HSR uses a ring that sends each frame in both directions. They are used in IEC 61850 substations, where losing a GOOSE or Sampled Values message is not acceptable.
Learn more: Ethernet redundancy protocols for substation automation networks · AG 800
PTP
Precision Time Protocol (IEEE 1588)PTP is the protocol that synchronizes device clocks over the Ethernet network itself, with microsecond accuracy or better.
The power utility profile (IEC 61850-9-3 / IEEE C37.238) is the one required by digital substations with Sampled Values, where all samples must share the same time base.
Learn more: Time synchronization in digital substations for Sampled Values · AG Test6
Sampled Values
IEC 61850-9-2Sampled Values is the IEC 61850 service that transmits digitized current and voltage samples over the network from merging units to IEDs.
It replaces the copper wiring from instrument transformers with optical fiber (process bus). It requires a high-availability network and precise time synchronization.
Learn more: IEC 61850 configuration: MMS and Sampled Values · Digital substations course
SCADA
Supervisory Control and Data AcquisitionA SCADA is the supervisory control and data acquisition system that centralizes field signals and allows facilities to be operated remotely.
It shows the network state on operator screens (HMI), records alarms and events, stores historical data, and sends commands to devices, usually through gateways and telecontrol protocols.
Learn more: AG Builder3
SCL (ICD, CID, SCD)
Substation Configuration Language (IEC 61850-6)SCL is the IEC 61850 XML language that describes the IEDs, their data model, and the communication configuration of a substation.
The ICD describes what an IED can do, the SCD describes the entire substation, and the CID is the configuration loaded into each device. With an SCD you can simulate the IEDs before having them on site.
Learn more: AG Test6 · IEC 61850 course
Substation gateway
A substation gateway is the device that concentrates IED data in several protocols and delivers it, converted, to the SCADA or the control center.
It acts as a client toward field devices (IEC 61850, DNP3, Modbus) and as a server toward the upper level (IEC 60870-5-104, DNP3, ICCP). It usually includes redundancy and cybersecurity functions.